phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | ||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 02-interactive-tui | 01 | tui |
|
|
|
|
|
|
|
|
|
4min | 2026-03-22 |
Phase 02 Plan 01: Core TUI Summary
Ratatui-based interactive TUI with sortable connection table, summary header, bandwidth coloring, and keyboard-driven navigation replacing Phase 1 stdout output
Performance
- Duration: 4 min
- Started: 2026-03-22T02:18:45Z
- Completed: 2026-03-22T02:22:16Z
- Tasks: 3
- Files modified: 8
Accomplishments
- Built full TUI module (app.rs, draw.rs, event.rs) with sortable, filterable connection table
- Added bandwidth-intensity row coloring (dim to bright) and new/closing connection highlights
- Wired terminal lifecycle and clap CLI with 7 flags (--port, --pid, --process, --interface, --tcp, --udp, --interval)
- Replaced Phase 1 stdout streaming with ratatui rendering in tokio::select! loop
Task Commits
Each task was committed atomically:
- Task 1: Add dependencies and create TUI module with App state -
f0f50d7(feat) - Task 2: Create draw.rs and event.rs for rendering and keyboard handling -
17b84fe(feat) - Task 3: Wire TUI into main.rs with terminal lifecycle and clap CLI -
e05dbb4(feat)
Files Created/Modified
tcptop/src/tui/mod.rs- TUI module root declaring app, draw, event submodulestcptop/src/tui/app.rs- App state struct with InputMode, SortColumn, CliFilters, sort/filter/highlight methodstcptop/src/tui/draw.rs- Rendering: 3-region layout (header, table, status bar), help overlay, bandwidth coloringtcptop/src/tui/event.rs- Keyboard handler: mnemonic sort keys, filter-as-you-type, quit, column toggle, scrollingtcptop/src/main.rs- Terminal init/restore, clap Cli struct, EventStream in select loopCargo.toml- Added ratatui, crossterm, futures workspace dependenciestcptop/Cargo.toml- Added ratatui, crossterm, futures crate dependenciestcptop/src/lib.rs- Addedpub mod tui;
Decisions Made
- Used
Color::Rgb(0, 60, 0)andColor::Rgb(80, 0, 0)for subtle new/closing connection highlights since ratatui does not have DarkGreen/DarkRed named color variants - Moved
Cli::parse()inside#[cfg]blocks to eliminate unused variable warnings when compiling on macOS (Linux-only collector path)
Deviations from Plan
Auto-fixed Issues
1. [Rule 1 - Bug] Fixed DarkGreen/DarkRed color constants
- Found during: Task 2 (draw.rs rendering)
- Issue: Plan specified
Color::DarkGreenandColor::DarkRedbut ratatui 0.30 only has standard ANSI Color variants (no dark green/red) - Fix: Used
Color::Rgb(0, 60, 0)for new connections andColor::Rgb(80, 0, 0)for closing connections - Files modified: tcptop/src/tui/draw.rs
- Verification:
cargo checkcompiles clean - Committed in:
17b84fe(Task 2 commit)
2. [Rule 1 - Bug] Fixed unused variable warnings on macOS
- Found during: Task 3 (main.rs wiring)
- Issue:
clivariable andConnectionTableimport unused when compiling on macOS (no Linux cfg) - Fix: Moved
Cli::parse()inside cfg blocks, added#[cfg(target_os = "linux")]to ConnectionTable import - Files modified: tcptop/src/main.rs
- Verification:
cargo checkproduces zero warnings on macOS - Committed in:
e05dbb4(Task 3 commit)
Total deviations: 2 auto-fixed (2 bugs) Impact on plan: Minor API differences from plan spec. No scope creep.
Issues Encountered
None
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- TUI rendering pipeline complete, ready for Plan 02 (sort/filter/CSV wiring)
- All keyboard shortcuts implemented and ready for interactive use
- --interface flag parsed but not yet wired to collector (documented as TODO for Plan 02)
Phase: 02-interactive-tui Completed: 2026-03-22